City Steel — Building the Future
Our Projects

Recent Projects

Explore a selection of our recent industrial steel structure projects delivered across Bangladesh.

Mezzanine Steel Building
COMPLETED
Dhaka

Mezzanine Steel Building

Rooftop steel frame for a mezzanine and additional floors on an existing building in Dhaka. City Steel fabricated the built-up columns and beams with bolted splice connections at our Hemayatpur, Savar factory and erected them on the roof.

Explore Case Study
Multi-Storied Steel Building
COMPLETED
Dhaka

Multi-Storied Steel Building

Multi-storied steel building in Dhaka with composite steel floor deck slabs. City Steel installed the steel floor decking with shear studs and reinforcement over the steel frame, ready for concrete casting floor by floor.

Explore Case Study
Factory Shed Roof Sheet Replacement
COMPLETED

Factory Shed Roof Sheet Replacement

Roof sheet replacement for an existing factory shed. City Steel removed the old damaged roofing and installed new colour-coated profiled metal roof sheets over the steel purlins, with sealing and fixing for a weather-tight roof.

Explore Case Study
Garments Factory Steel Building
COMPLETED

Garments Factory Steel Building

Multi-level structural steel building for a garments factory. City Steel fabricated the built-up columns, floor beams, roof frame and bracing at our Hemayatpur, Savar factory and erected them on site with steel floor decking.

Explore Case Study
Garments Factory Steel Shed
COMPLETED

Garments Factory Steel Shed

Pre-engineered steel shed for a garments factory. City Steel fabricated the built-up steel columns, rafters, purlins and bracing at our Hemayatpur, Savar factory and erected the long multi-bay frame on site.

Explore Case Study
6-Storied Steel Building
COMPLETED
Dhaka

6-Storied Steel Building

Multi-storey structural steel frame for a 6-storied building in Dhaka. City Steel fabricated the built-up steel columns and beams with bolted splice and moment connections at our Hemayatpur, Savar factory and erected the frame on site.

Explore Case Study
Dhaka Metro Rail Steel Pipe Truss
COMPLETED
Dhaka

Dhaka Metro Rail Steel Pipe Truss

Tubular steel pipe truss fabrication for a Dhaka Metro Rail project. City Steel fabricated and welded the pipe truss members with base plates under engineer supervision and quality inspection.

Explore Case Study
Atech Group Dining Hall
COMPLETED

Atech Group Dining Hall

Steel structure works for the large worker dining hall of Atech Group. City Steel carried out structural steel modification and strengthening of the roof frame, with fabrication at our Hemayatpur, Savar factory and on-site welding and installation inside the running facility.

Explore Case Study
Cafe Gulshan
COMPLETED
Gulshan, Dhaka

Cafe Gulshan

Steel frame structure with composite floor deck for Cafe Gulshan in Gulshan, Dhaka. City Steel fabricated the steel columns, beams and floor framing at our Hemayatpur, Savar factory and erected them on site with galvanized steel floor decking.

Explore Case Study
Asian Development Bank (ADB) Covered Walkway
COMPLETED
Dhaka

Asian Development Bank (ADB) Covered Walkway

Steel covered walkway for the Asian Development Bank (ADB) office campus in Dhaka. City Steel fabricated the steel columns, beams and roof frame at our Hemayatpur, Savar factory and erected them on site inside the operational campus.

Explore Case Study
Duplex Bungalow House, Manikganj
COMPLETED
Manikganj

Duplex Bungalow House, Manikganj

Steel roof structure and external steel staircase for a duplex bungalow house in Manikganj. City Steel fabricated the steel columns, roof frame, purlins and staircase at our Hemayatpur, Savar factory and installed them with colour-coated metal roof sheeting on site.

Explore Case Study
DOHS Central Mosque, Mirpur DOHS
COMPLETED
Mirpur DOHS, Dhaka

DOHS Central Mosque, Mirpur DOHS

Structural steel floor extension for DOHS Central Mosque in Mirpur DOHS, Dhaka. City Steel fabricated and erected the steel beam framing and composite steel floor decking with shear studs at our Hemayatpur, Savar factory and on site.

Explore Case Study
Vintage Garments Ltd
COMPLETED
Gazipur

Vintage Garments Ltd

Steel structure factory building for Vintage Garments Ltd in Gazipur. City Steel handled structural design, fabrication at our Hemayatpur, Savar factory and on-site erection.

Explore Case Study
Singer Bangladesh Ltd
COMPLETED
Araihazar, Narayanganj

Singer Bangladesh Ltd

Steel structure industrial building for Singer Bangladesh Ltd at Araihazar. City Steel handled structural design, fabrication at our Hemayatpur, Savar factory and on-site erection.

Explore Case Study
Steel Pontoon — Bangladesh Army
COMPLETED
Purbachal 300 Feet, Dhaka

Steel Pontoon — Bangladesh Army

Steel pontoon fabrication for the Bangladesh Army at Purbachal 300 Feet, Dhaka. City Steel handled structural design, fabrication at our Hemayatpur, Savar factory and on-site erection.

Explore Case Study
Paramount Textile Ltd
COMPLETED
Gazipur

Paramount Textile Ltd

Steel structure factory building for Paramount Textile in Gazipur. City Steel handled structural design, fabrication at our Hemayatpur, Savar factory and on-site erection.

Explore Case Study
Nest Evana Tower
COMPLETED
Gulshan, Dhaka

Nest Evana Tower

Steel structure works for Nest Evana Tower in Gulshan, Dhaka. City Steel handled structural design, fabrication at our Hemayatpur, Savar factory and on-site erection.

Explore Case Study
Mak Vision Agro Ltd
COMPLETED
Gopalganj

Mak Vision Agro Ltd

Steel structure agro-industrial building for Mak Vision Agro Ltd in Gopalganj. City Steel handled structural design, fabrication at our Hemayatpur, Savar factory and on-site erection.

Explore Case Study
Kalyar Replica Limited
COMPLETED
Ashulia, Savar

Kalyar Replica Limited

Steel structure factory building for Kalyar Replica Limited in Ashulia, Savar. City Steel handled structural design, fabrication at our Hemayatpur, Savar factory and on-site erection.

Explore Case Study
Japan Tobacco International (JTI)
COMPLETED
Tongi, Gazipur

Japan Tobacco International (JTI)

Steel structure building for Japan Tobacco International in Tongi, Gazipur. City Steel handled structural design, fabrication at our Hemayatpur, Savar factory and on-site erection.

Explore Case Study
East West University
COMPLETED
Dhaka

East West University

Steel structure works for East West University, Dhaka. City Steel handled structural design, fabrication at our Hemayatpur, Savar factory and on-site erection.

Explore Case Study
University of Dhaka
COMPLETED
Dhaka

University of Dhaka

Steel structure works for the University of Dhaka. City Steel handled structural design, fabrication at our Hemayatpur, Savar factory and on-site erection.

Explore Case Study
Dhaka North City Corporation (DNCC)
COMPLETED
Dhaka

Dhaka North City Corporation (DNCC)

Steel structure works for Dhaka North City Corporation. City Steel handled structural design, fabrication at our Hemayatpur, Savar factory and on-site erection.

Explore Case Study
Cox's Bazar Steel Structure Project
COMPLETED
Cox's Bazar

Cox's Bazar Steel Structure Project

Steel structure building project in Cox's Bazar. City Steel handled structural design, fabrication at our Hemayatpur, Savar factory and on-site erection.

Explore Case Study
Borak Tower
COMPLETED
Baridhara, Dhaka

Borak Tower

Steel structure works for Borak Tower in Baridhara, Dhaka. City Steel handled structural design, fabrication at our Hemayatpur, Savar factory and on-site erection.

Explore Case Study
Best Dwell Engineering
COMPLETED
Jamgora, Ashulia

Best Dwell Engineering

Steel structure building for Best Dwell Engineering at Jamgora, Ashulia. City Steel handled structural design, fabrication at our Hemayatpur, Savar factory and on-site erection.

Explore Case Study
Bengal Hurricane Ltd
COMPLETED
Bangla Bazar, Gazipur

Bengal Hurricane Ltd

Steel structure factory building for Bengal Hurricane Ltd in Gazipur. City Steel handled structural design, fabrication at our Hemayatpur, Savar factory and on-site erection.

Explore Case Study
Bangladesh Army — Purbachal 300 Feet
COMPLETED
Purbachal 300 Feet, Dhaka

Bangladesh Army — Purbachal 300 Feet

Steel structure works for the Bangladesh Army at Purbachal 300 Feet, Dhaka. City Steel handled structural design, fabrication at our Hemayatpur, Savar factory and on-site erection.

Explore Case Study
Axis Village Ltd
COMPLETED
Nayanpur, Gazipur

Axis Village Ltd

Steel structure building for Axis Village Ltd in Nayanpur, Gazipur. City Steel handled structural design, fabrication at our Hemayatpur, Savar factory and on-site erection.

Explore Case Study
Axis Knitwear Ltd
COMPLETED
Nayanpur, Gazipur

Axis Knitwear Ltd

Steel structure factory building for Axis Knitwear Ltd in Nayanpur, Gazipur. City Steel handled structural design, fabrication at our Hemayatpur, Savar factory and on-site erection.

Explore Case Study
Arabi Fashion Ltd
COMPLETED
Monipur Bazar, Gazipur

Arabi Fashion Ltd

Steel structure factory building for Arabi Fashion Ltd in Gazipur. City Steel handled structural design, fabrication at our Hemayatpur, Savar factory and on-site erection.

Explore Case Study
Adhuri Apparels Ltd
COMPLETED
Narsingdi

Adhuri Apparels Ltd

Steel structure factory building for Adhuri Apparels Ltd in Narsingdi. City Steel handled structural design, fabrication at our Hemayatpur, Savar factory and on-site erection.

Explore Case Study